Construction of the 4th road bridge across the Yenisei River in Krasnoyarsk on the section between Dubrovinsky str. and Sverdlovskaya str. (1st stage)
Customer
Regional state institution "Roads Management in Krasnoyarsk region"
Time 02.10.2012 31.12.2015
The object characteristics:
Type of building: New
Characteristics of pavement and the type of coating:capital, concrete
The technical category of the road: the street of the citywide value with continuous traffic
The total length of the bridge: 6771 m
Construction length at the main run : 1942 m
Length of the bridge: 1273 m
The bridge layout: (92,69+4*147,0+92,69) + (63,0+69,0+84,0+78,0+2*63,0+42,0+27,0)
Overall dimensions of the bridge: 2*14,25+2*1,5
Number of strips: 6
The object was completed: October 29, 2015