© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

Quality days at the facilities «Highway Bypass of the city of Khabarovsk, km 13 - km 42»and“ Bridge crossing over the river Pur »

In the period from October 23 to November 13, 2019 at the objects “Highway Bypass of the city of Khabarovsk, km 13 - km 42” and “Construction of a section of a public highway of regional or inter-municipal importance of the Yamalo-Nenets Autonomous Okrug Korotchaevo-Krasnoselkup, including the bridge across the river Pur” days of quality were held.
The event was held by the chief engineer, the head of the engineering surveying department and the head of the company’s laboratory as part of the internal audit and included a comprehensive check of construction sites, a working meeting with responsible representatives of customers and internal meetings to conduct geodetic and laboratory control, to monitor the implementation of environmental protection measures environment and the implementation of safety measures and labor protection.

Survey of the laboratory of a subcontracting organization by chief engineer G. Rudenko and the head of the laboratory L. Golubenko.

Verification of the plan-height position of the grillage formwork.