© «Bridge Bureau»
2023
All rights reserved.
Site development:Разработка сайта

«Quality Day» at the facility: «Major overhaul of the Birzhevoy Bridge across the river. Malaya Neva»

On June 16, 2022, the Chief Engineer of Bridge Bureau LLC Pushkarev M.V. “Day of Quality” was organized at the facility: “Major overhaul of the Birzhevoy Bridge across the river. Little Neva.
Together with the leading engineer for supervision Ivanykin P.N. they visited the construction site.
The main purpose of the event was a visual inspection of the scope of work performed and a comprehensive inspection of the work carried out by the General Contractor NP GPSK Vozrozhdenie.