© «Bridge Bureau»
2022
All rights reserved.
Site development:Разработка сайта

Preparation for commissioning of the construction object «Highway Bypass of the city of Khabarovsk km 13 - km 42»

In the period from 24 to 26 August 2021, the management of Bridge Bureau LLC conducted a working trip to the construction site "Highway Bypass of the city of Khabarovsk km 13 - km 42".
General Director Ilyin D.V., Chief Engineer G.M. Rudenko, Deputy Chief Engineer P.I. Chzhen and the head of the construction control service Alkhimenkov I.A. conducted a working tour of the construction sites and discussed current issues with field employees.

During the trip, meetings were also held with the Customer (Regional Concession Company LLC), the General Contractor (TrestGidroMontazh JSC) and the General Designer (Giprostroymost-SPb Institute JSC), at which they discussed the readiness of the construction object for commissioning operation.