© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

Planned survey aerial video of the current state of the bridge over the Pur River

On September 10, at the site “A section of a public highway of regional or intermunicipal importance of the Yamal-Nenets Autonomous Okrug Korotchaevo-Krasnoselkup, including the bridge over the Pur River,” using the drone DJI Mavic 2 Zoom, a planned video survey of the current state of the bridge under construction across the river Pur.