© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

Quality Week at the facility "Construction of a bridge across the river. Pur on the highway Korotchaevo - Urengoy»

In the period from July 8 to July 16 at the object “A public road section of regional or inter-municipal significance of the Yamal-Nenets Autonomous Okrug Korotchaevo - Krasnoselkup, incl. bridge crossing river Pur” a Quality Week was held.

The event was held by the chief engineer of the company as part of an internal audit and included:

  • Comprehensive verification of the work of the general contracting organization of JSC Mostostoroy 11 and the implementation of construction control by specialists of Bridge Bureau LLC under the existing contract;
  • Checking the storage conditions of the measuring geodetic equipment, the availability of relevant calibrations and analysis of the need to purchase additional geodetic equipment;
  • Checking the storage conditions of laboratory equipment, the availability of relevant calibrations and analysis of the need to purchase additional laboratory equipment;
  • Checking the operating conditions of automobile transport;
  • Verification of the providing of employees with working clothes and personal protective equipment;
  • Verification of compliance by employees with labor protection and safety requirements;