© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

QUALITY WEEK AT THE OBJECT «CONSTRUCTION OF A BRIDGE CROSSING OVER RIVER PUR ON THE KOROTCHAEVO-URENGOY HIGHWAY»

On the period from September 9 to September 13, a quality week was held at the object “A public highway section of regional or inter-municipal significance of the Yamalo-Nenets Autonomous Okrug Korotchaevo-Krasnoselkup, including the bridge over the Pur River”.

The event was held by the chief engineer of the company and the head of the department of surveys and tests of artificial structures as part of the internal audit and included:

  • Comprehensive verification of the work of the general contracting organization of Mostostroy 11 JSC and the implementation of construction control by the specialists of Bridge Bureau LLC under the existing contract;
  • Verification of the provision of employees with work clothes and PPE;
  • Verification of compliance by employees with labor protection and safety requirements;

Also during the trip, a scheduled survey aerial video survey of the current state of the bridge under construction over the Pur River was carried out using the unmanned drone DJI Mavic 2 Zoom.