© «Bridge Bureau»
2024
All rights reserved.
Site development:Разработка сайта

Quality days at the «Bridge over the Ob River in the alignment of Ippodromskaya St., Novosibirsk»

In the period from 22 to 26 December 2020, Chief Engineer of Bridge Bureau LLC organized the Quality Days at the construction site: "Bridge crossing over the Ob River in the alignment of Ippodromskaya Street in Novosibirsk."

The main goal of the event was to maintain the quality management system in a stable working condition by assessing the effectiveness of the company's specialists in fulfilling contractual obligations, visual inspection of the volume of work performed, as well as checking the availability of the necessary equipment for the laboratory post and the structural unit of the engineering geodesy department at the facility.

Also during the event, meetings were held with representatives of the customer (LLC "Siberian Concession Company") and a representative of the general contractor (LLC Production Company VIS).

Checking the availability of the necessary equipment of the engineering geodesy department at the facility

 

Checking the work of the company's laboratory post at the facility