Construction based on public-private partnership of the highway «Western High-Speed Diameter». 4th and 5th stage of construction
Customer
ICA Astaldi-IC Ictas AS
Time 20.12.2012 31.03.2017
Characteristics of the object::
The central part of one of the key urban highways connecting the northern, central and southern districts of St. Petersburg.
4th stage: PK86+55,07 – PK142+20,00
- road junction in the Ekateringofka river area
- two-level bridge across the Sea Canal
- двухъярусная эстакада вокруг о. Белый two-level overpass around White lake
- cable-stayed bridge over Ship's fairway
5th stage: PK142+20,00 – PK202+30,94 (left) / PK202+33,99 (right)
- cable-stayed bridge across Ship's fairway
- semitunnels and a tunnel under the Smolenka river in Vasilievsky Island area
- road junction in Makarova embankment area.
- cable-stayed bridge across the Petrovsky Canal
- bridge crossing in the mouth of the Middle and Minor Nevka
- road junction in Savushkina street area.