Implemented Surveillance Facilities Federal facility «Construction of transport passage across the Kerch Strait» Terms: 28.10.2016 - 30.06.2020 Ultrasonic inspection of welded joints at the facility: «Construction of Moscow-St. Petersburg high-speed road M-11. 7 and 8 stages». Terms: 01.07.2017 - 31.12.2017 Construction based on public-private partnership of the highway «Western High-Speed Diameter». 4th and 5th stage of construction Terms: 20.12.2012 - 31.03.2017 The road from Veliky Novgorod-Khutyn road to Velikiy Novgorod-Luga road with a bridge across the Volkhov River in Veliky Novgorod Terms: 11.01.2013 - 31.12.2014 Construction of the 4th road bridge across the Yenisei River in Krasnoyarsk on the section between Dubrovinsky str. and Sverdlovskaya str. (1st stage) Terms: 02.10.2012 - 31.12.2015 Geodesic support during construction and installation works on the site: «Rostov Nuclear Power Plant, Volgodonsk» Terms: 11.06.2013 - 14.12.2013 Engineering support of construction at the facility: «Bridge crossing over Zolotoy Rog Bay in Vladivostok city» Terms: 07.09.2009 - 11.08.2012 Technical supervision at the site: «Construction of Dzhubga-Sochi highway at the bypass of Sochi city.» Terms: 01.02.2008 - 30.10.2009 Technical supervision and quality control at the facility: «Construction of Dzhubga-Sochi highway on the bypass of Sochi, PK 134 - PK 194 in Krasnodar region» Terms: 31.12.2007 - 30.10.2009