Engineering support of construction at the facility: «Bridge crossing over Zolotoy Rog Bay in Vladivostok city»
Customer
Department of Road Management in Primorsky region
Time 07.09.2009 11.08.2012
Engineering support of construction at the facility: "Bridge crossing over Zolotoy Rog Bay in Vladivostok city on the motorway connecting the federal highway M-60 "Ussuri" Khabarovsk - Vladivostok withRussian island»
The object characteristics:
The cable-stayed bridge layout 42+90+2х100+737+2х100+90+49
The length of the cable bridge across the Zolotoy Rog Bay - 1388 m
The width of the bridge between the rails is 29.4 m
Pylon height - 225.75 m
Number of lanes - 4
The length of the central span is 737 m
Bridge clearance - 60 m